LEVEL 6

 

MISSILE SILO

SITE 4

VENTING BETWEEN SILO WALL AND CRIB

 

PROPELLANT LOADING LINES

 

PROPELLANT LOADING LINES

NOTE:  END OF CRIB SUSPENSION SYSTEM

 

PROPELLANT LOADING AND DRAIN LINES

 

NEAR THE END OF THE CRIB SUSPENSION SYSTEM

 

CABLE TRAYS

 

FREIGHT AND PERSONNEL ELEVATOR ENTRANCE

NOTE:  EXHAUST DUCTING FOR DIESEL GENERATOR ON LEVEL SIX

 

ELEVATOR ACCESS TO MISSILE ENCLOSURE AREA

 

SPIRAL STAIRS 

 

SPIRAL STAIRS END ON LEVEL 7 AND LADDER BEGINS

 

THIS AREA HELD THE SECOND DIESEL GENERATORS

 

CRIB CONSTRUCTION

NOTE:  BEHIND THIS AREA ONCE STOOD THE LAUNCH PLATFORM COUNTERWEIGHTS

 

MORE CABLE TRAYS AND OUR ONLY WAY DOWN TO LEVEL 8

 

SOME OF THE CONNECTORS FOR THE PROPELLANT LOADING SYSTEM

 

SWIVEL CONNECTOR FOR PROPELLANT LOADING SYSTEM

 

LOOKING UP TOWARD LEVEL 5 WITH VENT OPENINGS

 

EXHAUST DUCT AND CABLE TRAYS

 

FREIGHT AND PERSONNEL ELEVATOR OUTER DOOR

 

SIGHT TUBE FOR COLLUMATOR

 

ELECTRICAL JUNCTION BOX ABOVE SITE TUBE

 

ELEVATOR ACCESS TO MISSILE ENCLOSURE AREA

 

LOOKING DOWN ON WHAT IS LEFT OF LEVEL 7

NOTE:  LADDER IS STILL INTACT

 

DIESEL EXHAUST DUCTS

 

COLLIMATOR SITE ROOM ROOF

 

END OF CRIB SUSPENSION SYSTEM ABOVE COLLIMATOR ROOM

 

BACK SIDE OF DOOR WAY LEADING TO FREIGHT AND PERSONNEL ELEVATOR

 

INTERIOR VIEW OF COLLIMATOR ROOM

 

LIGHT FIXTURE REMAINING IN COLLIMATOR ROOM

 

COLLIMATOR ROOM

 

ELEVATOR ACCESS TO MISSILE ENCLOSURE AREA

 

HOME ] UP ] LEVEL  2 ] LEVEL 3 ] LEVEL  4 ] LEVEL  5 ] [ LEVEL  6 ] LEVEL  7 ] LEVEL  8 ]

 

 

Copyrighted ©  1996-2007   The Housing Group, Inc.   All Rights Reserved.