LEVEL 6 |
MISSILE SILO SITE 4
VENTING BETWEEN SILO WALL AND CRIB
PROPELLANT LOADING LINES
PROPELLANT LOADING LINES NOTE: END OF CRIB SUSPENSION SYSTEM
PROPELLANT LOADING AND DRAIN LINES
NEAR THE END OF THE CRIB SUSPENSION SYSTEM
CABLE TRAYS
FREIGHT AND PERSONNEL ELEVATOR ENTRANCE NOTE: EXHAUST DUCTING FOR DIESEL GENERATOR ON LEVEL SIX
ELEVATOR ACCESS TO MISSILE ENCLOSURE AREA
SPIRAL STAIRS
SPIRAL STAIRS END ON LEVEL 7 AND LADDER BEGINS
THIS AREA HELD THE SECOND DIESEL GENERATORS
CRIB CONSTRUCTION NOTE: BEHIND THIS AREA ONCE STOOD THE LAUNCH PLATFORM COUNTERWEIGHTS
MORE CABLE TRAYS AND OUR ONLY WAY DOWN TO LEVEL 8
SOME OF THE CONNECTORS FOR THE PROPELLANT LOADING SYSTEM
SWIVEL CONNECTOR FOR PROPELLANT LOADING SYSTEM
LOOKING UP TOWARD LEVEL 5 WITH VENT OPENINGS
EXHAUST DUCT AND CABLE TRAYS
FREIGHT AND PERSONNEL ELEVATOR OUTER DOOR
SIGHT TUBE FOR COLLUMATOR
ELECTRICAL JUNCTION BOX ABOVE SITE TUBE
ELEVATOR ACCESS TO MISSILE ENCLOSURE AREA
LOOKING DOWN ON WHAT IS LEFT OF LEVEL 7 NOTE: LADDER IS STILL INTACT
DIESEL EXHAUST DUCTS
COLLIMATOR SITE ROOM ROOF
END OF CRIB SUSPENSION SYSTEM ABOVE COLLIMATOR ROOM
BACK SIDE OF DOOR WAY LEADING TO FREIGHT AND PERSONNEL ELEVATOR
INTERIOR VIEW OF COLLIMATOR ROOM
LIGHT FIXTURE REMAINING IN COLLIMATOR ROOM
COLLIMATOR ROOM
ELEVATOR ACCESS TO MISSILE ENCLOSURE AREA
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |