LEVEL 4

 

MISSILE SILO

SITE 4

OUR ACCESS CABLE TRAY TO LEVEL 4

 

REMAINING FLOORING FOR LEVEL 3

NOTE: LIGHT ABOVE ON UTILITY TUNNEL ENTRANCE

 

LOOKING ACROSS MISSILE ENCLOSURE AREA

 

PERSONNEL AND FREIGHT ELEVATOR AREA

 

LOOKING DOWN ON LEVEL 5

 

LOOKING DOWN ON LEVEL 5

 

LOOKING DOWN ON LEVEL 5 WITH ELEVATOR ACCESS TO MISSILE ENCLOSURE AREA

NOTE:  SPIRAL STAIRCASE HAS FALLEN OVER

 

 

DUCTING AND CABLE TRAYS

 

CRIB SPRINGS

 

BEHIND HAND RAIL ONCE STOOD THE SPIRAL STAIRCASE

 

ENTRANCE AREA FOR FILL AND VENT LINES

 

FREIGHT AND PERSONNEL ELEVATOR ENTRANCE FOR LEVEL 4

 

 

LOOKING UP TO LEVEL 3

NOTE:  FLOOR DRAINS

 

LOOKING UP AT ENTRANCE TO FILL AND VENT SHAFT

 

DIESEL EXHAUST DUCTING

 

CRIB AND SILO WALL

NOTE:  IT'S STILL A LONG WAY DOWN

 

LOOKING INTO ELEVATOR SHAFT FROM MISSILE ENCLOSURE AREA 

 

HOME ] UP ] LEVEL  2 ] LEVEL 3 ] [ LEVEL  4 ] LEVEL  5 ] LEVEL  6 ] LEVEL  7 ] LEVEL  8 ]

 

 

Copyrighted ©  1996-2007   The Housing Group, Inc.   All Rights Reserved.