LEVEL 5 |
MISSILE SILO SITE 4 VERTICAL CRIB LOCK ATTACHED TO STRUT
LOOKING INTO MISSILE ENCLOSURE AREA WITH ELEVATOR ACCESS
CONNECTION POINT FOR CRIB FRAME WITH SUSPENSION SYSTEM
OUR CABLE TRAY ENTRANCE NOTE: METAL SIDING SURROUND LEVEL 5
LOOKING DOWN ON LEVEL 6
EXHAUST DUCT OPENING FOR DIESEL GENERATOR
SPIRAL STAIRCASE HAS FALLEN
CRIB FRAME
AREA WHERE SPIRAL STAIRCASE ONCE STOOD
ENTRANCE TO ELEVATOR
THE ELEVATOR HAS BEEN REMOVED
ON THIS FLOOR, THE ELEVATOR PLATFORM COULD BE OPENED IN TWO DIFFERENT DIRECTIONS
ELEVATOR SHAFT WITH DOOR TO MISSILE ENCLOSURE AREA
VERTICAL CRIB LOCK
TOP OF ROOM THAT HELD THE COLLMINATOR SIGHT TUBE
DIESEL EXHAUST DUCT NOTE: OTHER DUCT IS FOR DIESEL EXHAUST LEVEL 6
LOOKING DOWN AT LEVEL 8
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |