LEVEL 3

 

MISSILE SILO

SITE 4

 

PERSONNEL AND FREIGHT ELEVATOR ENTRANCE

NOTE:  CRIB SHOCKS  AND DIESEL EXHAUST VENTS ON LEFT

 

CABLE TRAY FROM LEVEL 2

NOTE:  ENTRY AREA TO SILO IN UPPER RIGHT

 

FAR SIDE OF LEVEL 3

NOTE:  SPIRAL STAIRCASE AREA ON LOWER LEFT

 

CRIB SPRINGS AND STRUTS

 

OPENING TO FILL AND VENT SHAFT

 

SPRING HANGER BRACKET

NOTE:  EASTERN SILO DOOR MISSING HYDRAULIC RAM 

 

 

EXHAUST DUCTING FOR DIESEL GENERATORS ONCE LOCATED ON LEVELS 5 AND 6

 

LEVEL 2 FLOORING REMOVED

NOTE:  MISSILE ENCLOSURE AREA HAS BEEN REMOVED

 

AMF CONTROL BOX FOR THE LAUNCH PLATFORM

 

LOOKING DOWN ON LEVEL 4

NOTE:  SILVER COLORED MATERIAL WAS ONCE PART OF THE MISSILE ENCLOSURE AREA

 

NORTH SIDE OF THE MISSILE ENCLOSURE AREA

NOTE: BEHIND FOIL BACKED INSULATION MATERIAL WAS THE PERSONNEL AND FREIGHT ELEVATOR

 

REMAINING BEAMS 

 

LOOKING DOWN WHERE THE SPIRAL STAIRCASE ONCE STOOD

 

HOME ] UP ] LEVEL  2 ] [ LEVEL 3 ] LEVEL  4 ] LEVEL  5 ] LEVEL  6 ] LEVEL  7 ] LEVEL  8 ]

 

 

Copyrighted ©  1996-2007   The Housing Group, Inc.   All Rights Reserved.