| EXCAVATION | 
| 
 ATLAS F MISSILE SITE CONSTRUCTION 579th STRATEGIC MISSILE SQUADRON WALKER AFB ROSWELL, NEW MEXICO 
 SITE 6 COMPLETED BLAST OF 2ND 20 FOOT OPEN CUT 
 SITE 3 CONCRETE COLLAR AND 1ST RING BEAM 
 
 
 
 
 CONTROL OF WATER BY THE HALIBURTON PROCESS 
 
 PREPARATION FOR SECOND BLAST AT SITE 8 
 
 MUD AND WATER 
 
 BANG BOARD INSTALLATION AT SITE 2 
 
 LOADING BLAST HOLES UNDERWATER 
 
 
 TAKEN 12 OCTOBER 1960 AT SITE 5 
 
 EXCAVATION 
 MUCKING WATER AND MUD 
 
 MUCKING AT 100 FEET 
 
 MUCKING IN WATER 
 
 
 
 | 