EXCAVATION |
ATLAS F MISSILE SITE CONSTRUCTION 579th STRATEGIC MISSILE SQUADRON WALKER AFB ROSWELL, NEW MEXICO
SITE 6 COMPLETED BLAST OF 2ND 20 FOOT OPEN CUT SITE 3 CONCRETE COLLAR AND 1ST RING BEAM
CONTROL OF WATER BY THE HALIBURTON PROCESS
PREPARATION FOR SECOND BLAST AT SITE 8
MUD AND WATER
BANG BOARD INSTALLATION AT SITE 2
LOADING BLAST HOLES UNDERWATER
TAKEN 12 OCTOBER 1960 AT SITE 5
EXCAVATION
MUCKING WATER AND MUD
MUCKING AT 100 FEET
MUCKING IN WATER
|