CONCRETE

 

ATLAS F MISSILE SITE CONSTRUCTION

579th STRATEGIC MISSILE SQUADRON

WALKER AFB

ROSWELL, NEW MEXICO

 

RCONST38.jpg (148537 bytes)

SILO FLOOR CONCRETE PLACEMENT

 

RCONST15.jpg (118780 bytes)

ERECTING FIRST WALL FORM

 

RCONST40.jpg (92597 bytes)

3RD LIFT FORM WITH COLLIMATOR INSERT

 

RCONST12.jpg (207519 bytes)

INSTALLING REINFORCEMENT FOR 6TH LIFT

 

RCONST10.jpg (68944 bytes)

 

 

RCONST4.jpg (61436 bytes)

 

 

RCONST42.jpg (146455 bytes)

COMPLETED CONCRETE PLACEMENT IN LAUNCH CONTROL CENTER WALLS

 

RCONST43.jpg (103405 bytes)

CONCRETE PROTECTION

 

RCONST7.jpg (60593 bytes)

 

 

RCONST8.jpg (70499 bytes)

 

 

RCONST41.jpg (173280 bytes)

INSTALLING LAUNCH CONTROL CENTER INNER WALL FORMS

 

RCONST50.jpg (151480 bytes)

BACKFILLING OPEN-CUT

 

RCONST54.jpg (161436 bytes)

AERIAL VIEW SITE 3

 

HOME ] UP ] EXCAVATION ] [ CONCRETE ] CRIB ] INSTALLATION ] WATER TANKS ] MISC. ]

 

 

Copyrighted ©  1996-2007   The Housing Group, Inc.   All Rights Reserved.