EXTERIOR |
WALKER AFB ROSWELL, NEW MEXICO 579th STRATEGIC MISSILE SQUADRON SITE 12 THESE PHOTOS TAKEN IN 1997
ACCESS ROAD FROM HIGHWAY
QUONSET HUT PAD
PARKING AREA
SILO CAP AREA
ENTRY WAY WITH ESCAPE HATCH IN FOREGROUND
COMMUNICATION MANHOLE
ENTRY WAY
ENTRY WAY DOOR
COLLIMATOR SITE TUBE OPENING
WATER TANK STORAGE AREA NOTE: ENTRY WAY IN BACKGROUND
DIESEL COOLING TOWER PAD
DIESEL AND RP-1 CATCHMENT TANK AREA
SEWER DRAIN FIELD
EVAPORATION PONDS
AIR INTAKE SHAFT
SILO DOORS
DRAINAGE MANHOLE ON THE SILO CAP AREA
FILL AND VENT SHAFT
AIR EXHAUST SHAFT NOTE: THE WATER TANKS IN THE BACKGROUND WERE ADDED IN THE MID 1980'S
SILO CAP AREA
WELL HOUSE AND WATER TREATMENT AND STORAGE AREA PAD
CLOSE UP OF THE WELL HOUSE AND WATER TREATMENT BUILDING PAD NOTE: THE 4 INCH RUBBER LINE IN THE BACKGROUND
WATER STORAGE AREA
ONE OF TWO WELLS NOTE: THIS WELL IS BEING USED TO PUMP WATER SEVEN MILES TO A POND THAT IS PROVIDING WATER FOR THE NEW HIGHWAY CONSTRUCTION
FENCING USED AROUND THE WATER TREATMENT FACILITY
EVAPORATION PONDS
SALVAGED MATERIAL STILL REMAINS AROUND THE SITE NOTE: DRAINAGE CULVERT IN BACKGROUND
DRAINAGE CULVERT FOR THE SITE
SEPTIC TANK
QUONSET HUT PAD NOTE: THESE PADS ARE 40 X 100 FEET
ANOTHER QUONSET HUT PAD
VIEW FROM ACCESS ROAD NOTE: EXCESS DIRT FROM CONSTRUCTION OF THE SITE
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |