PAGE 1 |
WALKER AFB ROSWELL, NEW MEXICO 579th STRATEGIC MISSILE SQUADRON SITE 12 LOWER LEVEL LAUNCH CONTROL CENTER
LOWER LEVEL NOTE: OFFICE IN THE BACKGROUND
LAUNCH CONSOLE AREA
BATTERY ROOM IN THE BACKGROUND
CENTER SUPPORT PARTITIONS ARE MISSING
ELECTRICAL CONDUITS COMING DOWN FROM THE UPPER LEVEL
PHONE COMMUNICATION PANEL
A/C DUCTING
SEWER DRAIN LINE
A/C DUCTING
SEWER SUMP VALVES
INSIDE UTILITY TUNNEL LOOKING INTO STAIRWELL
UTILITY TUNNEL ELECTRICAL
6" WATER LINE FROM 92,000 GALLON STORAGE TANKS
WATER LINE ENTERS UTILITY TUNNEL
SILO BLAST VESTIBULE AREA
CABLE WAY TO SILO
WATER LINES FOR HVAC SYSTEM
WATER LINES
BLAST VESTIBULE FLOOR
BLAST DOOR INTERLOCK
FINAL BLAST DOOR TO SILO
LEVEL 2 LANDING SILO
HAND RAIL NOTE: ALL STRUCTURE HAS BEEN REMOVED
ONE OF FOUR SHOCK MOUNTS FOR SILO CRIB
STRUTS HAVE BEEN CUT OFF
AIR INTAKE VENTS
BLAST DOOR OPENING MECHANISM
OPENING TO MISSILE SILO
6" WATER LINE
SEWER SUMP VALVES
SEWER SUMP VALVES
SEWER SUMP LINES
LOOKING UP STAIRWELL NOTE: SIGN READ "NO LONE ZONE TWO MAN CONCEPT MANDATORY"
LOOKING DOWN ON MISSING UTILITY TUNNEL NOTE: MISSING SECTION
UPPER STAIRWELL ELECTRICAL LINES TO BLAST VESTIBULE
4 " SEWER SUMP DISCHARGE & 3" VENT LINE
UPPER STAIRWELL BLAST VALVE
BLAST VESTIBULE CORNER
BLAST VESTIBULE SEPARATED CORNER
BLAST VESTIBULE HAS SETTLED
LOOKING THROUGH ENTRAPMENT AREA
ENTRYWAY STAIRWAY SUMP
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |