WALKER  AFB

ROSWELL, NEW MEXICO

579th STRATEGIC MISSILE SQUADRON 

SITE 12

LOWER LEVEL LAUNCH CONTROL CENTER

 

 

LOWER LEVEL

NOTE:  OFFICE IN THE BACKGROUND

 

 

LAUNCH CONSOLE AREA

 

 

BATTERY ROOM IN THE BACKGROUND

 

 

CENTER SUPPORT PARTITIONS ARE MISSING

 

 

ELECTRICAL CONDUITS COMING DOWN FROM THE UPPER LEVEL

 

 

PHONE COMMUNICATION PANEL

 

 

A/C DUCTING

 

 

SEWER DRAIN LINE

 

 

A/C DUCTING

 

 

SEWER SUMP VALVES

 

 

INSIDE UTILITY TUNNEL LOOKING INTO STAIRWELL

 

 

UTILITY TUNNEL ELECTRICAL

 

 

6" WATER LINE FROM 92,000 GALLON STORAGE TANKS

 

 

WATER LINE ENTERS UTILITY TUNNEL

 

 

SILO BLAST VESTIBULE AREA

 

 

CABLE WAY TO SILO

 

 

WATER LINES FOR HVAC SYSTEM

 

 

WATER LINES

 

 

BLAST VESTIBULE FLOOR

 

 

BLAST DOOR INTERLOCK

 

FINAL BLAST DOOR TO SILO

 

 

LEVEL 2 LANDING SILO

 

 

HAND RAIL

NOTE:  ALL STRUCTURE HAS BEEN REMOVED

 

 

ONE OF FOUR SHOCK MOUNTS FOR SILO CRIB

 

 

STRUTS HAVE BEEN CUT OFF

 

 

AIR INTAKE VENTS

 

 

BLAST DOOR OPENING MECHANISM

 

 

OPENING TO MISSILE SILO

 

 

6" WATER LINE

 

 

SEWER SUMP VALVES

 

 

SEWER SUMP VALVES

 

 

SEWER SUMP LINES

 

 

LOOKING UP STAIRWELL

NOTE:  SIGN READ "NO LONE ZONE TWO MAN CONCEPT MANDATORY"

 

 

LOOKING DOWN ON MISSING UTILITY TUNNEL

NOTE:  MISSING SECTION

 

 

UPPER STAIRWELL ELECTRICAL LINES TO BLAST VESTIBULE

 

 

4 " SEWER SUMP DISCHARGE &  3" VENT LINE

 

 

UPPER STAIRWELL BLAST VALVE

 

 

BLAST VESTIBULE CORNER

 

 

BLAST VESTIBULE SEPARATED CORNER

 

 

BLAST VESTIBULE HAS SETTLED

 

 

LOOKING THROUGH ENTRAPMENT AREA

 

 

ENTRYWAY STAIRWAY SUMP

 