LAUNCH AND SERVICE BUILDING

 

OPERATIONAL SYSTEMS TEST FACILITY  1

576th  SMS  SITE  F

OPEN DOOR LEADS TO LIQUID OXYGEN ROOM

NOTE:  CIRCULAR OPENING WAS FOR A LARGE LIQUID OXYGEN STORAGE TANK

 

FLAME DEFECTION PIT ON RIGHT

NOTE:  MISSILE ERECTION EQUIPMENT LOCATED ON OTHER SIDE OF OPEN DOOR

 

MISSILE ENTRY DOOR OPEN

NOTE:  CABLE TUNNEL LEADING TO LAUNCH OPERATIONS BUILDING

 

EQUIPMENT SHAFT FOR LAUNCH OPERATIONS BUILDING

NOTE:  CABLE TUNNEL LEADS TO THE RIGHT

 

MISSILE ENTRY DOOR LEADING TO MISSILE BAY

NOTE:  LIQUID OXYGEN ROOM ON LEFT AND MECHANICAL/ELECTRICAL ROOM ON RIGHT

 

LOOKING FROM UTILITY BUILDING PAD TO LAUNCH AND SERVICE BUILDING

NOTE:  MISSILE BAY LAUNCH DOOR IS THE ROOF WHICH SLIDES TO THE RIGHT

 

HOME ] UP ] [ LAUNCH  AND  SERVICE  BUILDING ] LAUNCH  OPERATIONS  BUILDING ] FLAME  DEFLECTION  PIT ]

 

 

Copyrighted ©  1996-2007   The Housing Group, Inc.   All Rights Reserved.