TITAN II CONSTRUCTION PHOTOS

 

TITAN II  MISSILE SITES

 

THIS SITE NEARING COMPLETION NEAR DAVIS-MONTHAN  AFB

NOTE: CABLEWAYS HAVE YET TO BE INSTALLED

 

390TH   STRATEGIC MISSILE SQUADRON

DAVIS-MONTHAN   AFB

   construction 1.jpg (967116 bytes)

BEGINNING EXCAVATION

 

construction 7.jpg (542912 bytes)

STARTING EXCAVATION OF SILO

 

construction 2.jpg (359942 bytes)

OVERALL COMPLEX VIEW 

NOTICE ONLY CONTROL CENTER AND SILO

 

construction 3.jpg (342804 bytes)

PREPARING TO POUR CONCRETE

 

 

MID CONSTRUCTION

construction4.jpg (676686 bytes)

SETTING FRAME WORK FOR SILO

 

construction 5.jpg (426880 bytes)

BLAST LOCK UNDER CONSTRUCTION

 

construction 6.jpg (529365 bytes)

CONTROL CENTER WITH BLAST LOCK

NOTELEVEL 3 FLOOR BEING PLACED

 

construction 9.jpg (583578 bytes)

OVERALL COMPLEX VIEW WITH COMPLETED BLAST LOCK

NOTECABLEWAYS YET TO BE CONSTRUCTED

 

FINAL CONSTRUCTION

construction 8.jpg (214311 bytes)

LONG AND SHORT CABLEWAYS YET TO BE CONSTRUCTED

 

silodoor placement.jpg (441148 bytes)

SILO CLOSURE DOOR BEING READIED FOR PLACEMENT

 

completed site.jpg (361562 bytes)

BACKFILLING COMPLETED

FUEL AND OXIDIZER HARD STANDS NEAR COMPLETE

 

INTERIOR CONSTRUCTION PHOTOS

390TH   STRATEGIC MISSILE WING

DAVIS-MONTHAN   AFB

cc lvl 2.jpg (499351 bytes)

CONTROL CENTER LEVEL TWO

 

launchduct deflector.jpg (596217 bytes)

LOOKING DOWN ON LAUNCH DUCT DEFLECTOR

 