THIS SITE NEARING COMPLETION NEAR DAVIS-MONTHAN AFB NOTE: CABLEWAYS HAVE YET TO BE INSTALLED
390TH STRATEGIC MISSILE SQUADRON DAVIS-MONTHAN AFB
BEGINNING EXCAVATION
STARTING EXCAVATION OF SILO
OVERALL COMPLEX VIEW NOTICE ONLY CONTROL CENTER AND SILO
PREPARING TO POUR CONCRETE
MID CONSTRUCTION
SETTING FRAME WORK FOR SILO
BLAST LOCK UNDER CONSTRUCTION
CONTROL CENTER WITH BLAST LOCK NOTE: LEVEL 3 FLOOR BEING PLACED
OVERALL COMPLEX VIEW WITH COMPLETED BLAST LOCK NOTE: CABLEWAYS YET TO BE CONSTRUCTED
FINAL CONSTRUCTION
LONG AND SHORT CABLEWAYS YET TO BE CONSTRUCTED
SILO CLOSURE DOOR BEING READIED FOR PLACEMENT
BACKFILLING COMPLETED FUEL AND OXIDIZER HARD STANDS NEAR COMPLETE
INTERIOR CONSTRUCTION PHOTOS 390TH STRATEGIC MISSILE WING DAVIS-MONTHAN AFB
CONTROL CENTER LEVEL TWO
LOOKING DOWN ON LAUNCH DUCT DEFLECTOR
|