EXTERIOR RE-HAB PG 1

 

WALKER  AFB

ROSWELL, NEW MEXICO

579th STRATEGIC MISSILE SQUADRON

SITE 4 

EXTERIOR PHOTOS

FRESHLY PRIMED ENTRYWAY

 

BEGINNING EXCAVATION FOR NEW ELECTRICAL AND PLUMBING INSTALLATION TO LAUNCH CONTROL CENTER

NOTELCC ROOF LINE IN LOWER AREA

 

BRUSH REMOVAL ON SILO CAP

 

REMOVING LARGE TREE FROM SILO CAP AREA

 

BRUSH REMOVAL FROM AROUND EXTERIOR

 

OPENING UP ESCAPE HATCH

 

OPENING UP AIR INTAKE AND EXHAUST SHAFTS

 

OPENING FILL AND VENT SHAFT 

 

 

 

 

STARTING TO RE-OPEN EMERGENCY ESCAPE HATCH OPENING

 

LAUNCH CONTROL CENTER ROOF WITH STAIRWELL AND CORNER OF ENTRYWAY

NOTE:  PIPE IN MIDDLE OF PHOTO IS SEWER VENT LINE FROM 3" SEWER BLAST VALVE

 

COPPER GROUNDING LINES LOCATED AROUND LAUNCH CONTROL CENTER

 

LOOKING DOWN ON TOP OF STAIRWELL

 

STAIRWELL WITH CORNER OF ENTRYWAY PRIOR TO ENTERING ENTRAPMENT AREA

 

SEWER LINE LEADING FROM STAIRWELL TO DISTRIBUTION BOX FOR SEPTIC TANK

 

 

SEWER LINE LEADING TO SEPTIC TANK

NOTE:  UNDERGROUND ELECTRICAL LINES 

 

SIDE OF LAUNCH CONTROL CENTER

 

TOP OF LAUNCH CONTROL CENTER WITH STAIRWELL AND SEWER LINE IN BACKGROUND

 

SIDE OF LAUNCH CONTROL CENTER

 

COPPER GROUNDING LINES

 

COPPER GROUNDING LINES SURROUNDED THE LAUNCH CONTROL CENTER

 

LOOKING UP AT AIR EXHAUST FOR LAUNCH CONTROL CENTER

 

 

BURIED UNDERGROUND LINES

 

LOOKING OVER LAUNCH CONTROL CENTER

NOTE:  ESCAPE HATCH

 

LEVELING DIRT FROM EXCAVATION

 

PUMPING AND CLEANING SEPTIC TANK AND DRAIN FIELD

 

CLEARING BRUSH EAST OF SILO CAP

 

LEVELING DIRT FROM LAUNCH CONTROL CENTER EXCAVATION

 

LOOKING ONTO LAUNCH CONTROL CENTER EXCAVATION FROM CONCRETE PAD IN FRONT OF FILL AND VENT SHAFT TO MISSILE SILO

 

 

CORNER OF SILO CAP

NOTE:  ACCESS ROAD ON FAR RIGHT

 

OVER LOOKING SILO CAP AND FILL AND VENT SHAFT OPENED

NOTE:  DRAINAGE MANHOLE

 

SILO CAP WITH AIR INTAKE SHAFT OPENED

 

LOOKING TO THE SOUTH OF THE SILO CAP AREA

 

LOOKING ACROSS SILO DOORS TO COOLING TOWER PAD

 

COOLING TOWER PAD WITH AREA CLEARED OF BRUSH

 

THIS AREA ONCE HELD TWO 15,000 GALLON TANKS

 

 

TWO 15,000 GALLON DIESEL FUEL AND ROCKET PROPELLANT #1 WERE STORED

 

CLOSE UP OF COOLING TOWER PAD

NOTE:  6" LINES TO AND FROM MISSILE SILO FOR COOLING WATER TO DIESEL GENERATORS

 

STARTING BACKFILL TO WATER STORAGE TANK AREA

NOTE:  WE HAVE ALREADY SEALED THESE LINES

 

LOOKING SOUTH FROM WATER TANK STORAGE AREA

 

COMMUNICATION MANHOLE

NOTE:  WE WILL BE RUNNING NEW ELECTRICAL LINES THROUGH THIS MANHOLE

 

SOME OF THE ORIGINAL LINES TO THE COMMUNICATION MANHOLE

NOTE:  MORE LINES ARE UNDERNEATH THESE

 

WATER TANK STORAGE AREA TO BE BACKFILLED ONCE NEW UNDERGROUND WATER STORAGE TANKS ARE INSTALLED

NOTE:  SIGHT TUBE IN THE BACKGROUND

 

 

STARTING CLEAN UP OF SILO CAP

 

A PHOTO HIGH ATOP THE DIRT PILE FROM THE WATER TANK STORAGE AREA

 

OVERLOOKING SOUTHWEST OF THE SITE

 

SOUTHEAST

 

EAST

 

NORTHEAST

NOTE:  IN THE FAR LEFT CORNER ONCE STOOD THE SOFT COMMUNICATION ANTENNA

 

NORTHEAST

 

 

NORTHEAST

 

NORTH

 

NORTHWEST

 

NORTHWEST

 

WEST

 

WEST

 

 

WEST

 

WEST

 

SOUTHWEST

 

OVERLOOKING SOUTHWESTERN PART OF SITE

 

COMMUNICATION LINES

 

STUB UPS FOR CHECK OUT

 

 

SALVAGED DEBRIS REMAINING

 

CABLE TRAYS AND LIGHT DEBRIS

 

DIRT BANK SEPARATING UPPER AND LOWER EVAPORATION PONDS

NOTE:  SPILLWAY IN MIDDLE OF PHOTO

 

CORNER OF EVAPORATION POND

 