EXTERIOR PG 2

 

WALKER  AFB

ROSWELL, NEW MEXICO

579th STRATEGIC MISSILE SQUADRON

SITE 4

QUONSET HUT PADS NEXT TO UPPER EVAPORATION POND

 

LOOKING TOWARD EASTERN SIDE OF SITE

 

ORIGINAL OUTER FENCE CORNER 

 

OUTER FENCE CORNER

NOTE:  LOWER EVAPORATION POND CORNER

 

QUONSET HUT PADS

 

QUONSET HUT PADS AND PARKING AREA

 

 

LOOKING SOUTH TOWARD QUONSET PADS AND EVAPORATION PONDS

 

LOOKING SOUTHWEST

 

PARKING AREA AND MAIN GATE

 

WATER LINE LEAVING AREA FOR SITE 5

 

CONTROL BOX FOR MAIN GATE

 

CONTROL BOX FOR MAIN ACCESS GATE

 

WATER TREATMENT CENTER

 

WASTE WATER MANHOLE FOR WATER TREATMENT TANKS

 

EVAPORATION POND DRAINAGE AREA BEHIND WATER TREATMENT CENTER

 

 

 

WATER LINE FROM TREATMENT BUILDING TO 92,000 GALLON WATER STORAGE TANKS

 

WATER LINE MARKER

 

WATER LINE MARKER APPROACHING WATER STORAGE TANKS

 

SEPTIC TANK WITH DISTRIBUTION BOX AND DRAIN FIELD FOR LAUNCH CONTROL CENTER

 

 

US ARMY CORPS OF ENGINEERS WELL DRILLED IN EARLY 1990'S

 

PARTS OF THE INSULATION BOARD THAT ONCE SURROUNDED THE MISSILE ENCLOSURE AREA

 

HARDENED HIGH FREQUENCY ANTENNA 

 

ENTRYWAY AND ESCAPE HATCH FOR LAUNCH CONTROL CENTER

 

ENTRYWAY TO LAUNCH CONTROL CENTER

 

AREA FOR 92,000 GALLON WATER STORAGE TANKS

 

BACKSIDE OF ENTRYWAY

 

SIGHT TUBE FOR COLLIMATOR 

NOTE:  THIS 10" LINE RUNS 140 FEET DOWN TO BELOW LEVEL 6 OF THE SILO

 

BASE FOR ULTRA HIGH FREQUENCY S.A.C. ANTENNA

 

 

SILO CAP

 

MISSILE SILO DOORS WITH CHECK OUT STUBS

 

FILL AND VENT SHAFT SEALED

 

LOOKING ONTO SILO CAP AREA FROM DIESEL COOLING TOWER

 

MISSILE TRAILER ALIGNMENT PADS

 

COOLING TOWER PAD FOR DIESEL GENERATORS ON LEVEL 5 & 6 OF SILO

 

AIR WASH DUCTING FOR AIR INTAKE SYSTEM

 

CLOSE UP OF AIR INTAKE DUCTING

 

 