EXTERIOR PG 2 |
WALKER AFB ROSWELL, NEW MEXICO 579th STRATEGIC MISSILE SQUADRON SITE 4
QUONSET HUT PADS NEXT TO UPPER EVAPORATION POND
LOOKING TOWARD EASTERN SIDE OF SITE
ORIGINAL OUTER FENCE CORNER
OUTER FENCE CORNER NOTE: LOWER EVAPORATION POND CORNER
QUONSET HUT PADS
QUONSET HUT PADS AND PARKING AREA
LOOKING SOUTH TOWARD QUONSET PADS AND EVAPORATION PONDS
LOOKING SOUTHWEST
PARKING AREA AND MAIN GATE
WATER LINE LEAVING AREA FOR SITE 5
CONTROL BOX FOR MAIN GATE
CONTROL BOX FOR MAIN ACCESS GATE
WATER TREATMENT CENTER
WASTE WATER MANHOLE FOR WATER TREATMENT TANKS
EVAPORATION POND DRAINAGE AREA BEHIND WATER TREATMENT CENTER
WATER LINE FROM TREATMENT BUILDING TO 92,000 GALLON WATER STORAGE TANKS
WATER LINE MARKER
WATER LINE MARKER APPROACHING WATER STORAGE TANKS
SEPTIC TANK WITH DISTRIBUTION BOX AND DRAIN FIELD FOR LAUNCH CONTROL CENTER
US ARMY CORPS OF ENGINEERS WELL DRILLED IN EARLY 1990'S
PARTS OF THE INSULATION BOARD THAT ONCE SURROUNDED THE MISSILE ENCLOSURE AREA
HARDENED HIGH FREQUENCY ANTENNA
ENTRYWAY AND ESCAPE HATCH FOR LAUNCH CONTROL CENTER
ENTRYWAY TO LAUNCH CONTROL CENTER
AREA FOR 92,000 GALLON WATER STORAGE TANKS
BACKSIDE OF ENTRYWAY
SIGHT TUBE FOR COLLIMATOR NOTE: THIS 10" LINE RUNS 140 FEET DOWN TO BELOW LEVEL 6 OF THE SILO
BASE FOR ULTRA HIGH FREQUENCY S.A.C. ANTENNA
SILO CAP
MISSILE SILO DOORS WITH CHECK OUT STUBS
FILL AND VENT SHAFT SEALED
LOOKING ONTO SILO CAP AREA FROM DIESEL COOLING TOWER
MISSILE TRAILER ALIGNMENT PADS
COOLING TOWER PAD FOR DIESEL GENERATORS ON LEVEL 5 & 6 OF SILO
AIR WASH DUCTING FOR AIR INTAKE SYSTEM
CLOSE UP OF AIR INTAKE DUCTING
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |