RE-HAB PAGE 3

 

WALKER  AFB

ROSWELL, NEW MEXICO

579th STRATEGIC MISSILE SQUADRON

SITE 10 

PHOTOS

STAIRWELL HANDRAIL

 

 

+

ENTRYWAY

 

 

SOME ITEMS FOUND IN PIT

NOTE:  LIGHT & VIDEO CAMERA BASES

 

 

WATER STORAGE PIT

 

 

MANIFOLD BOX

 

 

DEEPER HOLE

 

 

LARGE ROCKS

 

 

MAKING PROGRESS

 

 

CLEARING OUT BRUSH

 

 

QUONSET HUT PADS

 

 

LOOKING WEST

 

 

LOOKING SOUTH

 

 

ACCESS ROAD IN FRONT OF QUONSET HUT PADS

 

 

QUONSET HUT PADS

 

 

INNER SECURITY FENCE LINE

 

 

WATER TREATMENT BUILDING AND WELL HOUSE

 

 

WATER PIT

 

 

CLEARING AROUND UHF ANTENNA BASE

NOTE:  BLAST DETECTION BASE ON THE RIGHT

 

 

NON ORIGINAL FENCING TO SILO CAP

 

 

DUMP TRAILER

 

 

RESTROOM & KITCHEN CLEANED

 

 

KITCHEN AREA CLEANED

 

PREPARING TO CUT FLOOR

 

 

PREPARING TO CUT FLOOR FOR LOWER LEVEL DEBRIS REMOVAL

 

 

CUTTING FLOOR

 

 

CUTTING FLOOR

 

 

LOOKING UP FROM LOWER LEVEL

 

 

ALMOST THROUGH

 

 

FINISHED

 

 

TIME TO GET TO WORK

 

 

REMOVING DEBRIS

 

 

TRASH CAN CABLE

 

 

GETTING READY TO LOAD

 

 

MUCH MORE DEBRIS

 

 

STEEL PLATE THAT WAS REMOVED

 

 

PREPARING TO LOAD TRASH CAN

 

 

UTILITY TUNNEL DEBRIS IN BAGS

 

 

CUT WELDS HOLDING THIS BLAST DOOR SHUT

 

 

BLAST VESTIBULE LOOKING INTO SILO

 

 

WATER LINES

 

 

CUT WELDS

 

 

REMOVING UTILITY TUNNEL TRASH

 

 

TRASH GOING UP

 

 

MAKING HEADWAY

 

 

STARTING TO LOOK CLEANER

 

 

ONE MORE AREA TO GO

 

 

COMMUNICATION AREA OF LOWER LEVEL

 

 

UTILITY TUNNEL

 

 

STARTING TO LOOK BETTER

 

 

MORE PIPE INSULATION

 

 

CLEANED DRAIN LINES

 

 

CLEANED DRAIN LINES

 

 

CLEANED DRAIN LINES

 

• HOME • UP • RE-HAB  PAGE  4 •

 

Copyrighted ©  1996-2007   The Housing Group, Inc.   All Rights Reserved.