LAUNCH CONTROL FACILITY DELTA - 0 |
MINUTEMAN VANDENBERG AFB
DIAGRAM OF FACILITY FOR WINGS III, IV, V
MISSILE WING CONFIGURATIONS
DISPLAY OF THE FACILITY
MINUTEMAN LAUNCH FACILITY
DISPLAY BOARDS
ENTERING THE FACILITY
BLAST DOOR
FACILITY ELEVATOR
UPGRADE SIGN
ENTERING LAUNCH CAPSULE NOTE: THICKNESS OF THE BLAST DOOR
LAUNCH CREWS
LAUNCH CREW WRITINGS
INTERIOR OF LAUNCH CAPSULE
AIR CONDITIONING DUCTING FOR EQUIPMENT RACKS
EQUIPMENT RACKS
LAUNCH CONSOLE
EQUIPMENT RACKS
EQUIPMENT RACKS
SLEEPING AREA
SLEEPING AREA IN BACKGROUND
CREW CHAIRS
ESCAPE HATCH COVER
ESCAPE HATCH COVER
SHOCK MOUNTS
SHOCK MOUNTS AND AIR HANDLING EQUIPMENT
AIR HANDLING EQUIPMENT
DUCTING FOR AIR HANDLING EQUIPMENT NOTE: THE SPACE ABOVE INNER LAUNCH ROOM
SIDE WALLS
RETURNING TO THE FRONT OF THE CAPSULE
MORE LAUNCH CREWS
CEILING OF INNER LAUNCH AREA
INTERIOR EQUIPMENT
BACK WALL OF LAUNCH CAPSULE
MORE CEILING DUCTING
AIR HANDLING EQUIPMENT
THE HEAD
PIPING FROM FLOOR OF LAUNCH CAPSULE
MORE PIPING
CABLE SUPPORTS
MORE HOSES
CEILING AREA
SLEEPING AREA
ENTRANCE
CEILING
ESCAPE HATCH
SHOCK SUPPORTS
SIDE AREA
SIDE AREA
SHOCK STRUT
DOOR LOCKING PINS
BACK SIDE OF ENTRANCE DOOR
BLAST DOOR
LOCKING PINS FOR BLAST DOOR
FACILITY ELEVATOR
BLAST DOOR
THICKNESS OF BLAST DOOR
EQUIPMENT ROOM
EQUIPMENT ROOM
LEVELING SHOCK
EQUIPMENT
LEVELING SHOCK
SHOCK SUPPORT
•
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |