CARLTON |
550th STRATEGIC MISSILE SQUADRON ATLAS F SCHILLING, AFB SALINA, KANSAS SITE 4
SILO CAP WITH DOORS IN THE FOREGROUND
LOOKING ONTO SILO CAP WITH ENTRY WAY IN BACKGROUND
ENTRY WAY
STAIRWAY TO ENTRAPMENT AREA
BLAST DOOR
FIRST LEVEL LAUNCH CONTROL CENTER NOTE: HVAC ROOM ON LEFT
16" EXHAUST VALVE MISSING
CENTER SUPPORT COLUMN FOR LCC
ESCAPE HATCH
HVAC EQUIPMENT
DUCT WORK FOR HVAC
PLENUM FOR HVAC
CENTER SUPPORT COLUMN LCC
DOORWAY TO KITCHEN AREA
LOWER LEVEL CONTROL CENTER
BOTTOM OF CENTER SUPPORT COLUMN
BENEATH LOWER LEVEL LCC
STAIRWELL LOOKING UP
ENTRANCE TO UTILITY TUNNEL
FIRE AND DEBRIS DOOR
UTILITY TUNNEL NOTE: BLAST DOOR LOOKING BACK TO LCC
UTILITY TUNNEL BLAST DOOR AND CABLE WAY
AIR HANDLING DUCTWORK NOTE: SILO DOORS
SILO DOORS
CRIB SUPPORT HANGERS AND SPRINGS
UPPER SILO NOTE: BEHIND THIS PLENUM LIES TWO 46" AIR INTAKE BLAST VALVES
UPPER SILO
SILO DOORS
LOOKING FROM UTILITY TUNNEL ENTRANCE
CRIB SUPPORT HANGER AND STRUT
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |