REHAB PG 3

 

 

UPPER LEVEL LAUNCH CONTROL CENTER

NOTE:  AIR EXHAUST VENT OPENING IN THE BACKGROUND

 

 

MAIN GATE CONTROLLER LINE AND ENTRAPMENT AREA POWER FEED

 

 

MAIN ENTRANCE GATE CONTROLLER LINE

 

 

ENTRAPMENT AREA POWER LINE AND MAIN GATE CONTROLLER LINE AMONG OTHERS

NOTE:  AIR INTAKE VENT ON RIGHT

 

 

SEISMIC GROUND LOOP FOR BLAST DETECTION SYSTEM

 

 

COMMUNICATION MANHOLE LINES ON RIGHT

NORTHERN BLAST DETECTION BASE LINES IN THE CENTER

SEISMIC GROUND LOOP LINE FOR BLAST DETECTION SYSTEM ON THE LEFT

 

 

NORTHERN BLAST DETECTION BASE

 

COMMUNICATION MANHOLE LINES

 

 

ENTRAPMENT AREA VIDEO FEED LINE AND COMMUNICATION POLE

 

 

SOUTHERN BLAST DETECTION BASE LINES AND SEISMIC GROUND LOOP

 

MORE TO FOLLOW LATER...

 

MANY THANKS TO THE FISCHER'S FOR SHARING THESE GREAT PHOTOS

CONGRATULATION AND GOD SPEED

 