REHAB PG 3 |
UPPER LEVEL LAUNCH CONTROL CENTER NOTE: AIR EXHAUST VENT OPENING IN THE BACKGROUND
MAIN GATE CONTROLLER LINE AND ENTRAPMENT AREA POWER FEED
MAIN ENTRANCE GATE CONTROLLER LINE
ENTRAPMENT AREA POWER LINE AND MAIN GATE CONTROLLER LINE AMONG OTHERS NOTE: AIR INTAKE VENT ON RIGHT
SEISMIC GROUND LOOP FOR BLAST DETECTION SYSTEM
COMMUNICATION MANHOLE LINES ON RIGHT NORTHERN BLAST DETECTION BASE LINES IN THE CENTER SEISMIC GROUND LOOP LINE FOR BLAST DETECTION SYSTEM ON THE LEFT
NORTHERN BLAST DETECTION BASE
COMMUNICATION MANHOLE LINES
ENTRAPMENT AREA VIDEO FEED LINE AND COMMUNICATION POLE
SOUTHERN BLAST DETECTION BASE LINES AND SEISMIC GROUND LOOP
MORE TO FOLLOW LATER...
MANY THANKS TO THE FISCHER'S FOR SHARING THESE GREAT PHOTOS CONGRATULATION AND GOD SPEED
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |