| REHAB PG 3 | 
| 
 
 
 UPPER LEVEL LAUNCH CONTROL CENTER NOTE: AIR EXHAUST VENT OPENING IN THE BACKGROUND 
 
 
 MAIN GATE CONTROLLER LINE AND ENTRAPMENT AREA POWER FEED 
 
 
 MAIN ENTRANCE GATE CONTROLLER LINE 
 
 
 ENTRAPMENT AREA POWER LINE AND MAIN GATE CONTROLLER LINE AMONG OTHERS NOTE: AIR INTAKE VENT ON RIGHT 
 
 
 SEISMIC GROUND LOOP FOR BLAST DETECTION SYSTEM 
 
 
 COMMUNICATION MANHOLE LINES ON RIGHT NORTHERN BLAST DETECTION BASE LINES IN THE CENTER SEISMIC GROUND LOOP LINE FOR BLAST DETECTION SYSTEM ON THE LEFT 
 
 
 NORTHERN BLAST DETECTION BASE 
 
 COMMUNICATION MANHOLE LINES 
 
 
 ENTRAPMENT AREA VIDEO FEED LINE AND COMMUNICATION POLE 
 
 
 SOUTHERN BLAST DETECTION BASE LINES AND SEISMIC GROUND LOOP 
 MORE TO FOLLOW LATER... 
 MANY THANKS TO THE FISCHER'S FOR SHARING THESE GREAT PHOTOS CONGRATULATION AND GOD SPEED 
 
 | 