395-CHARLIE |
TITAN II 395th MISSILE TRAINING SQUADRON VANDENBERG AFB CALIFORNIA SITE CHARLIE PRESENT DAY MISSILE SITE PHOTOS
MAIN GATE
MAIN GATE LOOKING OVER SITE
PARKING AREA NOTE: SILO CAP AREA IN BACKGROUND
PARKING AREA
INSTALLED ANTENNA
TITAN I MISSILE DISPLAY NOTE: STAGE I HAS A LARGER DIAMETER THAN STAGE II REQUIRING A TRANSITION SECTION 10FT TO 8FT WHICH IS NOT REQUIRED ON THE TITAN II. STAGE II IS ALSO EQUIPPED (TRANSITION FARING) FOR A MARK IV WARHEAD, WHICH IS NOT A NORMAL TITAN II CONFIGURATION
SLIDING SILO DOOR
OTHER PARKING AREA NOTE: ACCESS PORTAL ON RIGHT
FIRST AND SECOND STAGE OF TITAN I MISSILE
LOADING AREA
CLOSE-UP OF LOADING AREA
SILO CAP
SILO CAP AND FIRST STAGE OF TITAN II NOTE: AIR SHAFT FOR EQUIPMENT AREAS LEVEL 3 & 4
EVAPORATION POND NOTE: STILL IN OPERATION
EVAPORATION POND
SILO CAP WITH SECOND STAGE TITAN I MISSILE
ACCESS PORTAL TO BLAST LOCK
VENTILATION AND ESCAPE SHAFT FOR LAUNCH CONTROL CENTER NOTE: ACCESS PORTAL BEHIND
CLOSE-UP OF ESCAPE AND VENTILATION SHAFT
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |